Employer : CHENAB VALLEY POWER PROJECTS LIMITED

Year : 25-03-2023
Project Name: KIRU HE PROJECT for CIVIL WORKS PACKAGE (Lot I), HM Package (Lot II), E&M Package (Lot III).
Country: Chenab

Project Information

Kiru Hydro-Electric (BOT) Project is a run-of-river scheme located in District Kishtwar of Jammu and Kashmir. With installed capacity of 624 MW, the project is proposed on river chenab and envisages construction of 123 mtr high (above river bed level) concrete gravity dam and an underground Power House with 4 units of 156 MW each.

At Axor, Kiru Hydro Electric Project (HEP) is a major initiative aimed at generating clean and renewable hydropower in the region. The project is being developed in phases, with multiple packages focused on different technical and construction aspects, including Civil Works (Lot I), Hydro-Mechanical Works (Lot II), and Electro-Mechanical Works (Lot III).